>

OUR PROJECTS

Supply and install of a new standby generator to an existing hospital with special consideration to minimise down time with the current system.
Supply and install of a 550kVA standby generator integrated with mains supply switchboard.
WPG supplied multiple 200kVA, heavy duty skid mounted generators to provide prime power to dewatering bore pumps for BHP.
200kVA trailer and skid mounted heavy duty prime power generators supplied & commission onsite for RioTinto’s dewatering bore pumps in the harsh Pilbara region of Western Australia.
Multiple diesel generators ranging from 20kVA to 100kVA, each with an external william hill slot gamesfuel cube for extended run times were supplied and commissioned by our team at WPG.
415kVA standby generator supply and installation, with integral 24 hour run time diesel base tank.
WPG was awarded this prestigious project facilitating the supply & installation of multiple 550kVA generator systems for a major Perth airport.
In the heart of WA’s Midwest region, West Power william hill mobile site loginGroup partnered with one of Australia leading pump companies to deploy a series of prime rated mine spec generators systems.
Located in the remote Pilbara region WPG supplied, installed and commissioned two complete 810kVA diesel generator systems for standby power.
Supply, install & commissioning a 900kVA Standby generator complete with an acoustic weather proof canopy and auto fuel system.
Upgrade to a new 720kVA standby generator, with decommission and disposal of existing 400kVA set.
Supply and install of a new 100kVA standby generator to an existing hospital with special consideration to minimise down time with the current system.
Supply & installation of a 2,300 Litre secondary fuel system for both main steam and hot water boilers.
350kVA Generators for a gold mine in West Africa, no problem for WPG.