>

william hill mobile site login

West Power Group supplied and commissioned a series of 20kVA, 30kVA, 60kVA and 100kVA diesel generators William Hill mobile siteto this Midwest Gold Mine, each with an external fuel cube for extended run times. Supplying a reliable source of prime power to our clients’ bore systems and transfer stations was key to this projects success. Integration with the sites’ wireless william hill mobile site loginMiri SCADA system was a requirement; along with multiple generators operating in parallel providing precise loading for different pump sequencing programs.

  • Multiple 20kVA, 30kVA, 60kVA and 100kVA prime rated mine spec diesel william hill football bettingdriven generators, each with external fuel cubes with integral selector valves for extended run times
  • Kohler, Iveco and Volvo Diesel engines
  • Meccalte Alternators
  • Deep Sea 7310 control systems
  • Solar battery charging systems
  • Lockable battery isolators
  • External quick connect fuel cube connections
  • Specialised synchronising control systems
  • Factory acceptance testing
  • Site commissioning
  • Electrical design
  • Site management
  • Project management